Friday, April 22, 2016

House on the Hill


All electric is pulled and plumbing, tubs/showers are set. Roof is shingled and HVAC is in. The front and back porch have been stained a beautiful walnut. Sheetrock comes in next week. The next step is soffit, eaves and siding, and he'll be there on Monday. After he's done the stone work guys will come and start the rest of the exterior. And every time I'm at the house, a neighbor waves! 







No comments:

Post a Comment